• Solids Control EquipmentMud Shale Shaker Degasser Mud Cleaner Centrifuge Mud Agitator Mud Gun Jet Mud Mixer Centrifugal Pump Shear Pump Spray Pump Vacuum Pump Mud Gas Separator Ignition Drilling Cuttings Dryer Filter Press Conveyor
  • Mud Treatment SystemDrilling Fluid Solids Control System Water-based Mud Treatment System Oil based Mud Treatment System Trenchless Mud Treatment System Mud Mixing System Drilling Fluid Cooling System Truck mounted Mud Circulation System Barite Recovery System
  • Tank and Steel StructureRig Mat Elevated Diesel Tank Nested Water Tank Fracturing Fluid Tank Drilling Pipe Basket Drill Cuttings Box Mud Storage Tank
  • Drilling Tools and Spare PartsMud Shale Shaker Spare Parts Centrifugal Pump Spare Parts Mud Pump Spare Parts Centrifuge Spare Parts Mud Tank Bottom Valve Mud Hopper Mud Tank Level Alarm Polyurethane Cyclone Electric Motor WPS Reducer Mud Tank Union Explosion-proof Water Tank Heater
  • ApplicationOilfield DrillingGas Geothermal DrillingTrenchless HDDDrilling Waste TreatmentSewage TreatmentTunnel ShieldTailings Dry Discharge
  • Contact us
    WhatsApp: 86-13735815206 / 86-17392256505
    WeChat: 86-13735815206 / 86-17392256505
    Phone: 86-29-88680837
    Mail: sales@hlsolidscontrol.com
    Add: Room 804, Building 1, Western Cloud Valley Phase II, Fengxi New Town, Xixian New District, Shaanxi Province

    What are the installation steps of the drilling fluid solids control system

    Time: 2023-06-03 Source: Author: hlsolidscontrol

    What are the installation steps of the drilling fluid solids control system?

    1. The foundation of the drilling fluid tank is required to be in the same horizontal plane, and the height difference is less than 10mm.

    2. Place the circulation tanks in sequence according to the wellsite plane and drilling fluid layout drawing based on the wellhead centerline.

    3. Connect the clean water pipeline between the tanks, the low connecting pipeline, the weighted suction and discharge pipeline, the drilling pump suction pipeline, etc.

    4. The vibrating screen is installed on the tank surface of the grit chamber.
    drilling fluid solids control system

    5. The deaerator is installed on the tank surface of the degassing bin, and the exhaust port is connected to a rubber pipe to discharge to a safe place. The discharge pipe extends below the liquid level in the drilling fluid tank on the side of the tank to allow the drilling fluid to flow into the next bin. . Then connect the water inlet to the water source.

    6. The de-sand cleaner and the de-slim cleaner are installed on the surface of the tank according to the layout drawing, and the sand discharge end is protruded from the side of the tank by 3~5cm to prevent drill cuttings from flowing into the tank, and it can also be tilted 3° to the outlet end.

    7. The installation of the medicine tank is installed on the corresponding tank surface according to the layout drawing. After fixing it, connect the inlet and outlet pipelines of the medicine tank.

    8. After installation, the centrifuge is fixed and connected to the liquid inlet pipe, and the liquid discharge pipe is discharged to the appropriate compartment according to the drilling requirements.

    9. Install the aisles between the tanks and the aisles and railings on the sides of each tank.

    10. Install elevated pipes and ladders, and connect the wellhead and elevated pipes with barbed pipes and hoses or hard pipes as required.

    11. The various connecting pipes between the tank and the tank adopt the connection method: the small diameter is the hammering union and the rubber pipe connection, and the large diameter is the hammering union and the steel pipe connection.

    12. Connect the circuit connectors of the equipment on the tank.

    If you want to know more about drilling fluid solids control system, welcome to send inquiry to us: sales@hlsolidscontrol.com.

    Tel: 86-29-88680837
    WhatsApp: 86-13735815206 / 86-17392256505
    WeChat: 86-13735815206 / 86-17392256505
    E-mail: sales@hlsolidscontrol.com
    Add: Room 804, Building 1, Western Cloud Valley Phase II, Fengxi New Town, Xixian New District, Shaanxi Province
    ©2023 Xi'an HL Petroleum Equipment Co., Ltd.