What should be paid attention to when assembling equipment for mud circulation tank

What should be paid attention to when assembling equipment for mud circulation tank?

1. Wear labor protection equipment.

2. Work with a certificate.

3. The connecting pipeline is connected correctly, and the valve opens slowly.

4. Pay attention to crushing, etc.

5. Use tools to place them at a concentrated point.
mud circulation tank
 

Precautions for operation of mud tank equipment:

1. All mud agitator should be checked for normal lubricating oil before use. Those who do not meet the standard should add lubricating oil.

2. All sand pumps and tank pumps should be checked before starting to ensure that they do not run in reverse.

3. The system can enter the working state only after the test runs normally.

4. Pay attention to electric shock during construction.

5. Recheck whether the sealing between the hose and the quick connector is intact.

6. Pay attention to anti-skid and anti-drop when working at heights.

7. Prevent blockage of debris pipeline.

8. Make a good operation record. 

Prev: What is the difference between shaftless and shafted screw conveyors Next: What is a solids control system
Product Center
Drilling Tools and Spare Parts
Solids Control Equipment
Mud Treatment System
Tank and Steel Structure
Hot Selling
Mission Pump Parts
Slurry Pump ( Vertical Sand Pump )
Sludge Vacuum Pump
Centrifugal Sand Pump