• Solids Control EquipmentMud Shale Shaker Degasser Mud Cleaner Centrifuge Mud Agitator Mud Gun Jet Mud Mixer Centrifugal Pump Shear Pump Spray Pump Vacuum Pump Mud Gas Separator Ignition Drilling Cuttings Dryer Filter Press Conveyor
  • Mud Treatment SystemDrilling Fluid Solids Control System Water-based Mud Treatment System Oil based Mud Treatment System Trenchless Mud Treatment System Mud Mixing System Drilling Fluid Cooling System Truck mounted Mud Circulation System Barite Recovery System
  • Tank and Steel StructureRig Mat Elevated Diesel Tank Nested Water Tank Fracturing Fluid Tank Drilling Pipe Basket Drill Cuttings Box Mud Storage Tank
  • Drilling Tools and Spare PartsMud Shale Shaker Spare Parts Centrifugal Pump Spare Parts Mud Pump Spare Parts Centrifuge Spare Parts Mud Tank Bottom Valve Mud Hopper Mud Tank Level Alarm Polyurethane Cyclone Electric Motor WPS Reducer Mud Tank Union Explosion-proof Water Tank Heater
  • ApplicationOilfield DrillingGas Geothermal DrillingTrenchless HDDDrilling Waste TreatmentSewage TreatmentTunnel ShieldTailings Dry Discharge
  • Contact us
    WhatsApp: 86-13735815206 / 86-17392256505
    WeChat: 86-13735815206 / 86-17392256505
    Phone: 86-29-88680837
    Mail: sales@hlsolidscontrol.com
    Add: Room 804, Building 1, Western Cloud Valley Phase II, Fengxi New Town, Xixian New District, Shaanxi Province

    Vacuum Degasser: How to Use a Vacuum Degasser in Drilling Mud System

    Time: 2026-03-05 Source: Author: hlsolidscontrol

    In modern oil and gas drilling operations, the vacuum degasser plays a critical role in maintaining drilling fluid stability. When gas invades the drilling mud, it reduces mud density, affects rheological properties, and may even lead to well control risks.

    A vacuum degasser is designed to efficiently remove free gas from drilling fluid and restore its original performance.

    In this article, we will explain how to use a vacuum degasser properly, including startup procedures, operating steps, precautions, and maintenance tips.


    What Is a Vacuum Degasser?

    A vacuum degasser is a solids control device installed after the shale shaker. Its main function is to remove entrained gas from gas-cut drilling fluid using negative pressure.

    When gas enters the mud system, it can cause:

    • Reduction in mud density

    • Pump cavitation

    • Poor separation performance of desander/desilter

    • Decreased centrifuge efficiency

    • Potential well control hazards

    Installing a vacuum degasser helps ensure system stability and drilling safety.


    Position of Vacuum Degasser in Solids Control System

    In a standard drilling solids control system, the vacuum degasser is installed in the following sequence:

    Shale Shaker → Vacuum Degasser → Desander → Desilter → Decanter Centrifuge

    This layout ensures gas removal before fine solids separation, protecting downstream equipment.


    How to Use a Vacuum Degasser

    1. Pre-Start Inspection

    Before starting the vacuum degasser, check the following:

    • Power supply and motor wiring

    • Vacuum pump condition

    • Belt tension (if belt-driven)

    • Mechanical seals

    • Inlet and outlet valves

    • Ensure suction pipe is submerged in mud

    Proper inspection prevents mechanical damage and ensures stable vacuum performance.


    2. Start-Up Procedure

    Step 1: Turn on the main motor.
    The vacuum pump begins creating negative pressure inside the tank.

    Step 2: Check the vacuum gauge.
    Normal working vacuum range:

    • -0.03 MPa to -0.05 MPa

    If vacuum cannot reach this range:

    • Check for air leakage

    • Inspect seals

    • Verify vacuum pump condition

    Step 3: Open the mud inlet valve.
    Mud enters the vacuum tank where:

    • Gas rapidly expands under negative pressure

    • Gas bubbles break

    • Gas is discharged through the exhaust port

    Degassed mud flows out from the bottom discharge outlet.


    3. During Operation

    Monitor the following:

    • Continuous gas discharge from exhaust port

    • Stable vacuum level

    • Smooth mud flow

    • No abnormal vibration or noise

    If no gas is discharged, the mud may have low gas content, which is normal.


    Important Operating Precautions

    Avoid Dry Running

    Never operate the vacuum degasser without mud supply.
    Dry running can damage:

    • Mechanical seals

    • Impellers

    • Vacuum pump

    Immediately stop the machine if mud supply stops.


    Use in Gas-Invasion Situations

    When drilling through gas-bearing formations, start the vacuum degasser early.

    Waiting until mud density drops significantly may:

    • Affect well control

    • Reduce separation efficiency

    • Impact centrifuge performance


    Ensure Smooth Discharge

    Degassed mud must flow freely to the next solids control stage to prevent overflow or pressure build-up.


    How a Vacuum Degasser Improves System Efficiency

    A properly operated vacuum degasser helps:

    • Restore mud density

    • Improve pump performance

    • Increase desander and desilter efficiency

    • Protect decanter centrifuge

    • Reduce overall operational risk

    It is especially critical in deep wells, gas wells, and underbalanced drilling projects.


    Vacuum Degasser Maintenance Tips

    To extend service life:

    • Regularly inspect mechanical seals

    • Check vacuum pump oil level

    • Clean exhaust pipeline

    • Avoid long-term idle operation without cleaning

    • Perform routine system inspection

    Proper maintenance reduces downtime and improves reliability.


    Conclusion

    The vacuum degasser is an essential component of any drilling mud solids control system. Correct operation ensures efficient gas removal, stable mud performance, and safer drilling operations.

    If you are looking for a reliable vacuum degasser for oil and gas drilling, choose a manufacturer with strong engineering support and proven field experience.

    Tel: 86-29-88680837
    WhatsApp: 86-13735815206 / 86-17392256505
    WeChat: 86-13735815206 / 86-17392256505
    E-mail: sales@hlsolidscontrol.com
    Add: Room 804, Building 1, Western Cloud Valley Phase II, Fengxi New Town, Xixian New District, Shaanxi Province
    ©2023 Xi'an HL Petroleum Equipment Co., Ltd.